---
title: "What are ChatGPT Projects and how to use them for work"
description: "A project keeps chats, files and instructions together so ChatGPT answers from the same context. How to set one up, what limits apply and where it falls short."
image: "https://bombos.ai/assets/og-en-v2.png"
---

# What are ChatGPT Projects and how do you use them for work?

Short answer

A ChatGPT project is a workspace for one topic: it keeps related chats, uploaded files, app links and project instructions together, and ChatGPT uses that context in every chat inside it. Projects are included on all plans, you can create as many as you like, and each holds 5 to 40 files depending on the plan. Project instructions override your global custom instructions.

*Piet Baudoin · published November 17, 2026 · November 17, 2026*

## What a project is

A project is a folder with a memory. It keeps related chats, files and instructions together, and ChatGPT uses all of that as context when you chat inside it. Instead of explaining a client, a product or a report format in every new chat, you explain it once in the project.

Good uses at work:

-   **One client or account**: proposals, contracts, meeting notes and the tone they like.
-   **A recurring report**: last month’s data and the format, so each new month starts from there.
-   **A process**: onboarding, support answers, a hiring round.

## Set up a project in five steps

1.  Select **New project** in the sidebar, then give it a name, icon and color.
2.  **Add files**: PDFs, spreadsheets, documents, images or pasted text. Up to 10 at a time.
3.  **Write instructions**: open the more options menu (•••) > **Project settings**. For example: “You write proposals for our agency. Use our pricing table, write in plain English, always end with next steps.” These instructions apply only inside the project and override your global custom instructions.
4.  **Add app links** if your plan supports it: in a private project, select **Add sources** and paste a Google Drive file or folder link or a Slack channel link.
5.  **Move existing chats in**: drag a chat onto the project or use **Move to project**. The chat then picks up the project’s instructions and files.

While you work, keep good output: on any answer, open the message menu and select **Add to project sources**. A summary or decision note saved that way becomes context for later chats.

## Limits per plan

|  | Free | Go, Plus | Pro, Business, Enterprise, Edu |
| --- | --- | --- | --- |
| Number of projects | Unlimited | Unlimited | Unlimited |
| Files per project | 5 | 25 | 40 |
| Collaborators when shared | 5 | 10 | 100 |

Source: OpenAI’s Projects article, November 2026. Projects inherit workspace settings: if an admin turns off a tool or memory for the workspace, it is off in every project too.

## Projects and memory, in short

Each project runs on **default memory** or **project-only memory**, set under **Project settings > Memory**:

-   **Default memory**: your saved memories are used and project chats can see other project chats. On Business and personal plans, chats can also reference conversations outside the project.
-   **Project-only memory**: only the project’s own chats and files count. Nothing from outside comes in and nothing goes out. ChatGPT Work is not available in these projects.

Shared projects always use project-only memory. How sharing works, with permissions per member, is covered in [can you share ChatGPT Projects with your team](https://bombos.ai/en/questions/chatgpt/chatgpt-projects-shared-team/).

## Projects or custom GPTs?

OpenAI describes GPTs as a static, single-player tool for reusable knowledge, and shared projects as a multiplayer space that grows as people add chats and files. With custom GPTs scheduled to retire on December 11, 2026, OpenAI itself suggests a project for ongoing work like writing, research or planning. A side-by-side comparison is in [ChatGPT Projects vs custom GPTs](https://bombos.ai/en/questions/chatgpt/chatgpt-projects-vs-custom-gpts/).

## The common mistake: treating a project as a knowledge base

A project helps ChatGPT answer from files you put in it, but it is not a managed knowledge base. Files are a manual upload with a cap of 40 at most; when your policy changes, someone has to replace the file. Project memory has no visible list, so you cannot check what ChatGPT drew from older chats; to stop it using a conversation, you delete or move that chat. And the Google Drive app does not sync content in advance inside a project. Use projects for active work, and keep your source of truth where it is maintained.

## What it means for a team

Projects are the best tool inside ChatGPT for shared team context: set one up per client or process, agree who maintains the instructions and files, and use project-only memory for anything confidential. The limit is that the context lives in ChatGPT only. Colleagues in Claude, Copilot or Cursor cannot read it, and a project does not move between workspaces on its own: projects you created can transfer when you merge your personal workspace into Business or Enterprise, subject to migration support and the destination workspace settings.

## Where Bombos fits

A project gives ChatGPT context for one topic. Bombos is a plugin that gives every AI tool your team uses one shared memory across all topics: team knowledge, learned rules about how you work and what already lives in mail, documents and repos, with traceable answers. It runs in the cloud or on your own server. For a comparison of the two project systems, see [ChatGPT Projects vs Claude Projects for a team](https://bombos.ai/en/knowledge-base/chatgpt-projects-vs-claude-projects-for-a-team/).

## Related questions

Do ChatGPT Projects cost extra?

No. Projects are included with every qualifying plan. Model and tool usage inside a project counts the same as in regular chats.

How many files can a project hold?

Free: 5 files per project. Go and Plus: 25. Pro, Business, Enterprise and Edu: 40. You can upload 10 files at a time. Google Drive and Slack links have a separate limit.

Can I move an existing chat into a project?

Yes. Drag it onto the project or choose Move to project in the chat menu. It then inherits the project's instructions and files. Chats created with a custom GPT cannot be moved.

Can ChatGPT Work run inside a project?

Not in projects set to project-only memory, and every shared project uses project-only memory. OpenAI lists ChatGPT Work as unavailable there.

## Sources

1.  [Projects in ChatGPT (OpenAI Help Center)](https://help.openai.com/en/articles/10169521-projects-in-chatgpt)
2.  [ChatGPT Custom Instructions (OpenAI Help Center)](https://help.openai.com/en/articles/8096356-chatgpt-custom-instructions)
3.  [Custom GPT retirement and migration FAQ (OpenAI Help Center)](https://help.openai.com/en/articles/20001519-custom-gpt-retirement-and-migration-faq)

## What does your AI forget?

1.  01You tell us which AI you use and where it keeps starting over.
2.  02We show what a shared memory changes there, on your own examples.
3.  03You keep the plan, with or without Bombos.

![Piet Baudoin](https://bombos.ai/assets/team/piet-klein.jpg)

**Piet Baudoin**You talk to Piet, from the Bombos teamDutch team from Utrecht and Nijmegen · data in Europe

## More questions about ChatGPT for business

-   [Can you share ChatGPT Projects with your team, and how does project memory work?](https://bombos.ai/en/questions/chatgpt/chatgpt-projects-shared-team/)
-   [How does ChatGPT memory work?](https://bombos.ai/en/questions/chatgpt/how-does-chatgpt-memory-work/)
-   [How do I move my ChatGPT projects to Claude?](https://bombos.ai/en/questions/chatgpt/move-chatgpt-projects-to-claude/)
-   [How do ChatGPT custom instructions work, and what should you put in them for work?](https://bombos.ai/en/questions/chatgpt/chatgpt-custom-instructions/)
-   [ChatGPT Projects vs custom GPTs: which should a team use now?](https://bombos.ai/en/questions/chatgpt/chatgpt-projects-vs-custom-gpts/)
-   [Where is ChatGPT Business and Enterprise data stored, and can it stay in the EU?](https://bombos.ai/en/questions/chatgpt/where-is-chatgpt-business-data-stored/)
-   [Is there a free trial for ChatGPT Business?](https://bombos.ai/en/questions/chatgpt/chatgpt-business-free-trial/)
-   [How much does ChatGPT Team (Business) cost per user?](https://bombos.ai/en/questions/chatgpt/chatgpt-business-pricing/)

[All questions about ChatGPT for business →](https://bombos.ai/en/questions/chatgpt/)


---

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://bombos.ai/#organization","name":"Bombos","url":"https://bombos.ai/","logo":"https://bombos.ai/assets/bombos-bee.png","description":"Bombos is the memory layer under every AI your team uses. One shared memory for Claude, ChatGPT, Copilot, Cursor and your own agents, that learns how you work.","sameAs":["https://www.linkedin.com/company/bombos-ai","https://www.youtube.com/@truebombos","https://www.instagram.com/truebombos/","https://bsky.app/profile/bombostrue.bsky.social","https://www.threads.com/@truebombos","https://mastodon.social/@Bombos","https://www.tiktok.com/@truebombos","https://t.me/truebombos","https://www.pinterest.com/truebombos/","https://github.com/bombos-ai","https://linktr.ee/bombos.ai","https://bombosai.substack.com","https://hashnode.com/@bombosai","https://hackernoon.com/u/bombos","https://dev.to/bombos"],"email":"info@bombos.ai","areaServed":["NL","Europe"],"knowsLanguage":["nl","en"],"contactPoint":{"@type":"ContactPoint","email":"info@bombos.ai","contactType":"sales","url":"https://bombos.ai/en/contact/","availableLanguage":["nl","en"]}},{"@type":"WebSite","@id":"https://bombos.ai/#website","name":"Bombos","url":"https://bombos.ai/","inLanguage":["nl-NL","en"],"publisher":{"@id":"https://bombos.ai/#organization"}}]}

{"@context":"https://schema.org","@type":"Article","headline":"What are ChatGPT Projects and how do you use them for work?","description":"A project keeps chats, files and instructions together so ChatGPT answers from the same context. How to set one up, what limits apply and where it falls short.","abstract":"A ChatGPT project is a workspace for one topic: it keeps related chats, uploaded files, app links and project instructions together, and ChatGPT uses that context in every chat inside it. Projects are included on all plans, you can create as many as you like, and each holds 5 to 40 files depending on the plan. Project instructions override your global custom instructions.","datePublished":"2026-11-17T00:00:00.000Z","dateModified":"2026-11-17T00:00:00.000Z","author":{"@type":"Person","name":"Piet Baudoin"},"publisher":{"@type":"Organization","@id":"https://bombos.ai/#organization","name":"Bombos","logo":{"@type":"ImageObject","url":"https://bombos.ai/assets/bombos-bee.png"}},"image":"https://bombos.ai/assets/og-en-v2.png","mainEntityOfPage":"https://bombos.ai/en/questions/chatgpt/what-are-chatgpt-projects/","inLanguage":"en-US","isPartOf":{"@type":"CollectionPage","name":"ChatGPT for business","url":"https://bombos.ai/en/questions/chatgpt/"},"citation":[{"@type":"CreativeWork","name":"Projects in ChatGPT (OpenAI Help Center)","url":"https://help.openai.com/en/articles/10169521-projects-in-chatgpt"},{"@type":"CreativeWork","name":"ChatGPT Custom Instructions (OpenAI Help Center)","url":"https://help.openai.com/en/articles/8096356-chatgpt-custom-instructions"},{"@type":"CreativeWork","name":"Custom GPT retirement and migration FAQ (OpenAI Help Center)","url":"https://help.openai.com/en/articles/20001519-custom-gpt-retirement-and-migration-faq"}]}

{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Bombos","item":"https://bombos.ai/en/"},{"@type":"ListItem","position":2,"name":"Questions","item":"https://bombos.ai/en/questions/"},{"@type":"ListItem","position":3,"name":"ChatGPT for business","item":"https://bombos.ai/en/questions/chatgpt/"},{"@type":"ListItem","position":4,"name":"What are ChatGPT Projects and how do you use them for work?","item":"https://bombos.ai/en/questions/chatgpt/what-are-chatgpt-projects/"}]}

{"@context":"https://schema.org","@type":"FAQPage","mainEntity":[{"@type":"Question","name":"Do ChatGPT Projects cost extra?","acceptedAnswer":{"@type":"Answer","text":"No. Projects are included with every qualifying plan. Model and tool usage inside a project counts the same as in regular chats."}},{"@type":"Question","name":"How many files can a project hold?","acceptedAnswer":{"@type":"Answer","text":"Free: 5 files per project. Go and Plus: 25. Pro, Business, Enterprise and Edu: 40. You can upload 10 files at a time. Google Drive and Slack links have a separate limit."}},{"@type":"Question","name":"Can I move an existing chat into a project?","acceptedAnswer":{"@type":"Answer","text":"Yes. Drag it onto the project or choose Move to project in the chat menu. It then inherits the project's instructions and files. Chats created with a custom GPT cannot be moved."}},{"@type":"Question","name":"Can ChatGPT Work run inside a project?","acceptedAnswer":{"@type":"Answer","text":"Not in projects set to project-only memory, and every shared project uses project-only memory. OpenAI lists ChatGPT Work as unavailable there."}}]}
```
